Mitigation Measures Analyzed
Up one level
10.1.1. Mitigation Measures Analyzed
|
Measures |
Estimated Cost, $US. |
|
|
1. |
Reconstruction of the first oil-recovery system |
$500,000 |
|
2. |
Reconstruction of dehydration section for wastewater sediments |
$200,000 |
|
3. |
Commissioning of the UV-disinfection plant |
$700,000 |
|
|
TOTAL: |
$1,400,000 |
(Note: Exchange rate $1 USD – 1,200 Belarus Roubles)
Associated measures used in Preliminary Analysis of Mozyr Refinery Wastewater Treatment Facilities
|
Measures |
Estimates $2001 USD |
|
Treatment Capacity |
Mechanical – 10,135,000 m3/year Chemical – 7,570,000 m3/year Biological – 29,127,000 m3/year |
|
Water Intake |
20,306,000 m3/year |
|
Actual Treatment |
Biological – 19,425,000 m3/year Chemical – 5,225,000 m3/year |
|
Payments for Wastewater Treatment |
Residents – $523,400 Industries – $604,500 Industry Subsidy – $1,695,000 |
|
Average Treatment Cost |
Residential – $0.09/m3 Industrial – $0.36/m3 |
|
Annual Operational Expenses |
Materials – $19,242 Energy – $1,154,431 Labour – $182,308 Debt Payments – $567,886 |
|
General Wastewater Treatment Expenses |
$3.2 million |
|
Net income (Annual) |
$200,000 |
|
Anticipated Annual Debt Payments of proposed investment program |
$570,000. |