Mitigation Measures Analyzed

Up one level

10.1.1. Mitigation Measures Analyzed

 

Measures

Estimated Cost, $US.

1.

Reconstruction of the first oil-recovery system

$500,000

2.

Reconstruction of dehydration section for wastewater sediments

$200,000

3.

Commissioning of the UV-disinfection plant

$700,000

 

TOTAL:

$1,400,000

 

(Note: Exchange rate $1 USD – 1,200 Belarus Roubles)

 

Associated measures used in Preliminary Analysis of Mozyr Refinery Wastewater Treatment Facilities

 

Measures

Estimates $2001 USD

Treatment Capacity

Mechanical – 10,135,000 m3/year

Chemical – 7,570,000 m3/year

Biological – 29,127,000 m3/year

Water Intake

20,306,000 m3/year

Actual Treatment

Biological – 19,425,000 m3/year

Chemical – 5,225,000 m3/year

Payments for Wastewater Treatment

Residents – $523,400

Industries – $604,500

Industry Subsidy – $1,695,000

Average Treatment Cost

Residential – $0.09/m3

Industrial – $0.36/m3

Annual Operational Expenses

Materials – $19,242

Energy – $1,154,431

Labour – $182,308

Debt Payments – $567,886

General Wastewater Treatment Expenses

$3.2 million

Net income (Annual)

$200,000

Anticipated Annual Debt Payments of proposed investment program

$570,000.

 

 

 

 